Estimating note

Pack-out and contents documentation

Placeholder. The final text for this page has not been added yet. Do not rely on it.

In short

A pack-out is easier to defend when each box has an inventory, a condition note, and a photo. This note will lay out a simple documentation routine for crews and the office.

Before the first box is packed

Placeholder. Final text to come. This section will cover room photos, the walk-through with the homeowner, and labeling.

Inventory and condition notes

Placeholder. This section will cover what each inventory line should say.

Photos that hold up

Placeholder. This section will cover photo order and what each photo should show.

Storage and return

Placeholder. This section will cover storage records and the pack-back.

  1. Missing items on water mitigation estimatesLine items that often go missing from water mitigation estimates, and how to document them so they hold up in review.Reviewed
  2. Insurer vs. contractor estimates: reading the gapWhy an insurer's estimate and a contractor's estimate for the same loss can differ, and how to compare them line by line.Reviewed